Skip to content

Family-owned since 2014 · 4.99 ★ × 463 reviews · 16,000+ jobs

Hot Tub Removal in New London County, CT

Waterford, East Lyme, and the Groton side — the lower New London shoreline is inside our map, and the tub comes out in one visit.

Let's settle the coverage question first, because in New London County it's the one that matters: we serve the lower portion of the county — the shoreline band running through Waterford, East Lyme, and the Groton side. That's the territory inside a ~45–75 minute reach of our yard, and it's where our trucks already run. The county's upper and far-eastern reaches are outside our map, and we'd rather say so in the second sentence than after you've called.

Inside that band, the work is shoreline work. Salt air is patient and thorough: it takes the heater first, then the cabinet fasteners, and eventually the owner's will to keep paying for chemicals. The tubs we retire out here tend to be genuinely done — corroded equipment packs, cabinets soft at the base — and the cut-up method handles them without drama, sections carried out through whatever the yard offers.

The sequence is the same as everywhere on our map: free walkthrough, price fixed in writing, your electrician disconnects the feed, and the tub is gone the same visit it comes apart — drained on site, hauled in our own truck, metal pulled for scrap at the transfer station.

The tub's address decides the tier

Two tiers, and where the tub lives picks which one is yours. The lower tier covers a tub sitting on grade — a pad, pavers, or a gravel bed with a path a person can walk. The higher tier covers the built-ins: tubs framed into a deck, dropped into a platform, or sunk into a vault, where the shell has to be freed before anything gets cut. The grid above renders both starting figures live from the same canonical pricing data as the demolition hub, so this page can't quietly drift from the master list.

Between the starting figure and your final number, the walkthrough weighs three things: how long and how pinched the carry path is, how much structure has to open up to free the shell, and how much of that structure you want gone for good versus patched around. Draining, disposal, and metal recycling all live inside the fixed price — there's no dump-fee line waiting on the invoice. That's what up-front pricing means on this job.

One honest aside: if your tub genuinely still runs, list it free-for-the-hauling locally for a week first. Working tubs occasionally find takers, and we're happy to be plan B when nobody bites. The full cost anatomy — DIY math included — lives in our hot tub removal cost guide.

Demolition pricing — published starting ranges

Every demo job is different — final quote confirmed on site after walkthrough. These are honest starting ranges so you can self-qualify before calling. Disposal of all materials is included in the total.

  • Hot tubs (on grade, drained)$400+

    Hot tub sitting on a pad or paver. We drain and dismantle on site.

    Half-day, 2-person crew

  • Hot tubs (in deck or sunken)$700+

    Hot tub set into a deck or sunken below grade — extra access work.

    Half-day to 1 day, 2-person crew

How the pricing works: Final quote confirmed on site after walkthrough. Disposal of all materials included in the total. We don't pull demo permits — that's the homeowner's responsibility when required.

Standalone outbuildings only — no interior demo, no full-house teardowns, no asbestos.

See demolition scope

Cut, slide, or crane — three ways a tub leaves

Cut-up in place is the default and the right call for most Connecticut yards. The shell and cabinet get sawed into carryable sections where the tub sits, and the pieces walk out through the same gate you use. An empty six-person tub still weighs several hundred pounds in the least carryable shape ever molded — cutting it beats wrestling it past a stone wall, and the flowerbeds survive.

Slide-out happens when the geography cooperates: tub on grade, wide path, no steps, truck close. We tip it, walk it on rollers, and it leaves in one piece — the fastest version of the job, and the one to ask for if a buyer or a new pad is waiting for the tub somewhere else.

Crane-out is the specialty case — a tub on a raised deck or behind an obstacle course where neither cutting nor sliding makes sense, usually because the tub needs to survive intact. It's the least common of the three and the one that most needs a walkthrough first.

Whichever method, the sequence is the same: your electrician kills and disconnects the feed before we arrive, we drain on site, and the tub is usually gone within a couple of hours of the first cut. One visit — we never leave a half-cut tub sitting overnight.

The eastern edge of the map

New London County jobs run on the I-95 corridor — the shoreline band we serve sits at the ~45–75 minute end of our reach, and we route jobs out here in blocks rather than scattered singles. Practically, that means booking a few days ahead gets you a firm window, and a job that pairs with a neighbor's — two tubs, or a tub plus a shed — schedules even easier.

On the ground, lower-county access is coastal access: modest yards, fences, and the occasional tub sited for the water view rather than the exit path. Sections carry out the way they do on any shore lot, and the walkthrough paces yours before the price is fixed. If you're unsure whether your address falls inside our lower-county band, ask when you call — it takes ten seconds to check.

What rides out, what stays behind

Everything that made it a hot tub rides out with us: shell, cabinet, cover, steps, heater, pump, and the equipment pack. The sections go to licensed CT transfer stations in our own trucks — shell broken down as bulky waste, cabinet lumber with the wood stream, and the metal pulled for scrap wherever the facility takes it, which is most of them.

Two things never ride with us. Water gets pumped on site as part of the job, routed somewhere on your property that isn't a foundation, a septic field, or the neighbor's yard. And leftover spa chemistry — chlorine, bromine, pH kits — is household hazardous waste that belongs at your town's HHW collection, not in a truck bed.

Concrete stays, per the same rule as every structure we remove: a pad under the tub becomes your patio or your next project's base. And an in-ground concrete or gunite spa is a different animal entirely — that's excavation and fill, coordinated through our licensed demolition partner rather than self-performed. The above-grade acrylic and rotomolded tubs — the vast majority of what's in CT backyards — are the ones our own crew handles start to finish.

Hot Tub Removal in New London County — questions we actually get

What happens to the hot tub after you take it?
It rides out in our own can and gets broken down at the transfer station — shell as bulky waste, frame lumber with the wood stream, and the metal (heater, pump, frame fasteners) pulled for scrap where the facility takes it.
How long does hot tub removal take?
Most tubs are out in one to two hours. A clear-access slide-out is the fast end; a deck-mounted tub that has to come apart with a reciprocating saw is the slow end. Either way it's a one-visit job — we don't leave a half-cut tub sitting overnight.
Do I need to drain the hot tub first?
Drain it if you can — it saves time and keeps the cut cleaner. If it won't drain because the pump is dead, tell us at booking and we'll pump it down on site before the cut.
Does the electrical need to be disconnected?
Yes, before we touch it. Most CT hot tubs run on a 50- or 60-amp 240-volt circuit, and disconnecting at the panel is licensed-electrician work, not hauler work. We cut and cap nothing electrical — the line must be dead and disconnected at the tub before the crew starts.
Can you remove a hot tub that's built into a deck?
Usually, yes. Deck-mounted tubs come apart in place — shell cut into sections, frame unbolted, everything walked out. If freeing the tub means cutting structural deck framing, that's a deck-removal conversation and we'll quote both parts before anyone starts cutting.
Which parts of New London County do you actually serve?
The lower county — the shoreline band through Waterford, East Lyme, and the Groton side, which sits within a ~45–75 minute reach of our yard. The upper and far-eastern parts of the county are outside our service area. If your address is near the edge, call and we'll give you a straight yes or no in ten seconds.
Does being at the far end of your map change the price or the timeline?
Not the price — there's no distance surcharge, and the number fixed at your walkthrough is final. The timeline just benefits from a little notice: we route lower-county jobs in blocks along I-95, so booking a few days ahead gets you a firm window instead of a wait for the next eastbound run.

New London County towns we serve

Drive times from our yard run ~45–75 min across the county.

More in New London County

Ready to book your delivery?

Same-day delivery when you call before 11 AM. Trucks dispatch Mon–Sat 8 AM – 4 PM (best-effort scheduling for earlier or later requests). Phones answered Mon–Fri 8 AM – 4 PM live, AI after-hours and weekends.