Skip to content

Family-owned since 2014 · 4.99 ★ × 463 reviews · 16,000+ jobs

Above-Ground Pool Removal in New London County, CT

Lower New London County is on our map — Waterford, East Lyme, and the Groton side — and the pool is off your lot in half a day.

Start with the map, because in New London County that's the question under every other question: we serve the lower county — the shoreline band through Waterford, East Lyme, and the Groton side, inside a ~45–75 minute reach of our yard. North and far-east of that band is outside our territory, and we'd rather say it here than waste your call.

Within the band, this is shoreline pool country, and shoreline pools age on the coast's schedule. Salt air finds the frame's steel long before the liner gives out — rusted uprights and seized top-rail hardware are the local signature — so lower-county frames get cut apart more often than unbolted, which changes our tools and nothing else. The pools come off modest coastal lots where the reveal is the reward: a yard that spent fifteen summers mostly pool becomes, in half a day, mostly yard.

The routine holds at this end of the map like every other: siphon the water down ahead if you can, liner first, walls folded, frame down, sand ring raked flat. We run eastbound jobs in blocks along I-95, so a few days' notice buys a firm window — and the walkthrough fixes the price in writing before a single bolt turns.

The lower-county run

Lower New London County work rides our I-95 eastbound blocks at the ~45–75 minute end of the map — which means a few days' notice converts to a firm window, and a job that pairs with another lower-county stop schedules quickest of all. No distance surcharge exists: the walkthrough price is the entire price.

On the lot, access is coastal-standard — modest fenced yards, gates built for people, and pools sited for sun rather than for exit paths. Wall sections fold to gate width, the liner rolls, and the carry loop runs short and steady. If your address sits near the boundary of our lower-county band, ask when you call; confirming coverage takes ten seconds and beats guessing.

Water first, walls last

One thing you can do before we arrive helps more than anything else: drain the pool. A garden-hose siphon over a day or two empties most of them. If it can't be drained ahead, say so at booking — pumping thousands of gallons on the day adds time, and we'd rather plan for it than discover it.

On the day, the order is fixed. The liner comes out first — it's the ugly part of the job, heavy with water memory and worse to handle than anything else on site. Then the walls, which fold faster than people expect once the top rail is off. The frame unbolts or cuts depending on age and rust, the ladder and plumbing load with it, and the pump and filter ride out last. If the pool has a serving deck, the deck comes down before the walls, boards up and framing after.

Half a day covers most pools, assuming the water's out. What's left when the truck pulls away is a sand ring, a flat spot, and — for a lot of our customers — the first full view of their own backyard in fifteen years.

Everything but the sand

The whole pool loads: walls, liner, frame, top rails, uprights, ladder, plumbing runs, and the pump-and-filter pack. If the pool has its own deck, the deck lumber loads too. Metal gets pulled for scrap where the transfer station takes it; the rest goes out as the mixed debris it is, in our own cans, at licensed CT facilities.

Two things stay. The sand base stays — it's clean fill, and hauling fill isn't what our cans do. Most homeowners rake the ring out flat and seed straight over it; by the second summer you'd never know the pool was there. And any concrete — a pad under the equipment, footings under a deck post — stays per the same rule we apply to every structure: posts cut at grade, concrete in the ground.

One thing we won't touch even to carry: leftover pool chemicals. Chlorine pucks, shock, algaecide, test kits — all of it is household hazardous waste, and it goes to your town's HHW collection, not in the truck. Set the bucket aside before the crew arrives and the rest of the equipment pack loads without a second thought.

Decking is the fork in the price

Above-ground pool pricing has two tiers, and the question that sorts them is simple: does the pool have its own deck? A pool standing alone — walls, liner, frame, ladder — is the lower tier. A pool with a serving deck, the ring or platform built to get swimmers over the wall, is the higher one, because the deck usually holds more lumber than people remember and all of it has to come down and load. The grid above renders both starting figures live from the same canonical pricing data as the demolition hub.

Past the tier, the walkthrough weighs pool size, how much deck there really is, and the carry path between the pool and the truck. The quote gets fixed in writing before anything comes apart, and it covers the tear-down, the loading, the disposal, and the raked-out footprint — up-front pricing with no scale-ticket surprise afterward.

One scope line worth knowing before you call: a full freestanding deck attached to the house is its own deck-removal job and gets quoted that way, not folded invisibly into the pool price. And the deeper cost anatomy lives in our above-ground pool removal cost guide.

Demolition pricing — published starting ranges

Every demo job is different — final quote confirmed on site after walkthrough. These are honest starting ranges so you can self-qualify before calling. Disposal of all materials is included in the total.

  • Above-ground pools (no decking)$600+

    Drained pool, no surrounding deck. Liner, walls, and frame removed.

    1 day, 2-person crew

  • Above-ground pools (with decking)$1000+

    Pool plus the wood deck around it — both removed in one job.

    1-2 days, 2-3 person crew

How the pricing works: Final quote confirmed on site after walkthrough. Disposal of all materials included in the total. We don't pull demo permits — that's the homeowner's responsibility when required.

Standalone outbuildings only — no interior demo, no full-house teardowns, no asbestos.

See demolition scope

Above-Ground Pool Removal in New London County — questions we actually get

Does the pool need to be drained before you come?
Ideally yes — a garden hose siphon over a day or two does it. If it can't be drained ahead, tell us at booking; pumping thousands of gallons on the day adds time and we'd rather plan for it than discover it.
Do you take the pool deck too?
If it's the pool's own deck — the ring or platform built to serve the pool — yes, it's part of the same job. A full freestanding deck attached to the house is its own deck-removal scope and gets quoted that way.
How long does above-ground pool removal take?
Half a day for most, assuming the water's out. The liner is the ugly part, the walls fold faster than people expect, and the frame unbolts or cuts depending on age and rust.
Can the pump and filter equipment go too?
Yes — pump, filter, hoses, chemicals excluded. Leftover pool chemicals are household hazardous waste and go to your town's HHW collection, not in the truck.
What's left when you're done?
A sand ring and a flat spot. The walls, liner, frame, plumbing, and ladder all go; the sand base stays (it's clean fill, and hauling fill isn't what our cans do). Most homeowners rake it out or seed straight over it.
Which New London County towns are inside your service area?
The lower county: the shoreline band through Waterford, East Lyme, and the Groton side, within a ~45–75 minute reach of our yard. The upper and far-eastern county is outside our map. Near the edge? Call with the address — it's a ten-second check and you'll get a straight answer.
The frame is badly rusted from the salt air. Does that complicate the removal?
It changes the tools, not the outcome. Seized hardware means we cut the frame apart instead of unbolting it — the standard condition on shoreline pools out here — and the job still lands in the same half-day. Mention the rust at booking so the crew loads the right blades, and don't worry about it beyond that.

New London County towns we serve

Drive times from our yard run ~45–75 min across the county.

More in New London County

Ready to book your delivery?

Same-day delivery when you call before 11 AM. Trucks dispatch Mon–Sat 8 AM – 4 PM (best-effort scheduling for earlier or later requests). Phones answered Mon–Fri 8 AM – 4 PM live, AI after-hours and weekends.