Family-owned since 2014 · 4.99 ★ × 463 reviews · 16,000+ jobs
In-Ground Pool Removal in New London County, CT
Shoreline pool demolition coordinated through our licensed demolition partner — every non-fill load goes out in our own dumpsters.
Shoreline pools age on a schedule all their own. Salt air works on the equipment, coastal winters work on the shell, and a pool that made sense when the house was a summer rental makes less sense every year the maintenance bill arrives. On the lower New London County shoreline — Waterford, East Lyme, and the Groton side, the stretch we serve — that's the pool this page exists for.
Coverage first, plainly: our New London County service is that lower-shoreline corridor, about 45–75 minutes from our West Haven yard down I-95. Farther east or inland, we'll say so on the first call.
The project itself splits the standard way. The excavation — breaking or pulling the shell, fill, compaction — is coordinated through our licensed demolition partner, contracted with you directly. Grizzly's fleet handles what rides in a can: decking, salt-tired equipment, fencing, and the debris stream the dig throws off, at posted rates, up and down the corridor our trucks already run daily.
Working the shoreline corridor
New London County pool logistics run on I-95: the lower shoreline sits on the corridor east of our West Haven yard, about 45–75 minutes out, and cans move both directions on a dependable rhythm. The planning attention goes to the last stretch — beach-community streets that run narrow, water-side lots where the pool sits below the road, and summer months when a shoreline street has less patience for a parked roll-off than October does.
Can placement and the machine path get settled on the partner's walk, and swaps are scheduled in blocks around the corridor run so heavy decking days don't stall the dig. Pool debris weight gets stated up front, same as everywhere we work.
How a pool removal actually runs
First call comes to us, with the pool type and rough dimensions if you know them. The partner takes the scope from there and settles the project's one big fork before quoting: partial removal — the common route, where the upper shell is demolished, the bottom is opened for drainage, and the hole is filled and compacted in lifts — or full removal, where every piece of the shell comes out first, which matters most when the future plan involves building over the footprint. Permitting is folded into the partner's scope; your building department answers the rest in one call.
Excavation days belong to the partner. The container rhythm belongs to Grizzly: cans placed for the debris path and swapped on the excavation timeline, so tear-out never stalls around a full box. Pool-adjacent debris runs heavy — wet decking, tile, waterlogged equipment — so the weight math gets stated up front rather than discovered on a scale ticket.
One piece of advice we give every owner: ask the partner to put the fill spec in writing. Ground compacted in lifts holds a shed or a swing set later. Ground filled in one pass does not, and nobody in this arrangement is selling you that version.
Two debris streams, plainly split
Everything that isn't clean fill is can work, and it goes out in Grizzly's own dumpsters at posted rates: concrete decking tear-out where it's in the partner's scope, the equipment pad's tenants — heater, pump, filter, plumbing runs — pool fencing headed for retirement, and the mixed C&D stream the excavation produces along the way. Most projects also bundle a junk-removal visit before the dig, because loungers, covers, ladders, and the pool shed's contents are Grizzly's own service outright, and the partner's equipment works better arriving to a clear yard.
Two things route elsewhere, and we'd rather say so here than surprise you on site. Clean concrete and fill move the way the partner's excavation plan dictates — broken shell often stays as engineered fill on a partial removal, which is part of why partial costs less. And leftover pool chemicals never ride in any can: opened chlorine, algaecide, and the rest are household hazardous waste bound for your town's HHW collection, not a roll-off.
What's left when both streams are gone is a filled, compacted footprint on its way back to being lawn — and a paper trail that shows which loads went where.
Quote-only, because the price is under the ground
An in-ground pool removal is priced by things a grid can't see from here: whether the shell is gunite or vinyl-liner, whether the property needs a partial fill-in or full shell removal, how the partner's equipment reaches the backyard, and how much fill the hole takes. Our licensed demolition partner scopes those questions on the property, quotes the excavation, and contracts it with you directly under their own license and insurance. Request a demolition quote and the intake covers both halves at once.
The half with posted numbers is the debris, and it runs on a plain industry fact: demolition and excavation companies rent their roll-off containers from someone. Grizzly owns a hundred identical 20-yard cans, staged from two Connecticut yards and dispatched by the people who take the first call. Decking tear-out, old equipment, fencing, the general C&D stream a pool project throws off — that volume is the part Grizzly controls end to end, at the same rates published all over this site. No third hauler in the middle, no markup on somebody else's fleet, and two contracts you can read separately instead of one blurry number.
In-Ground Pool Removal in New London County — questions we actually get
Is this the same as above-ground pool removal?
Full removal or partial fill-in — what's the difference?
Will the yard be usable after?
Does an in-ground pool removal need a permit?
What does Grizzly's fleet actually do on a pool job?
Do you handle pool removals east of Groton?
The salt air ate our pool equipment years ago — does that matter to the removal?
New London County towns we serve
Drive times from our yard run ~45–75 min across the county.
More in New London County
- Hot Tub Removal in New London County
- Shed Removal in New London County
- Above-Ground Pool Removal in New London County
- Deck Removal in New London County
- Fence Removal in New London County
- Garage Demolition in New London County
- House Demolition in New London County
- Dumpster rental in New London County
- In-Ground Pool Removal across Connecticut
- All demolition & removal services
Ready to book your delivery?
Same-day delivery when you call before 11 AM. Trucks dispatch Mon–Sat 8 AM – 4 PM (best-effort scheduling for earlier or later requests). Phones answered Mon–Fri 8 AM – 4 PM live, AI after-hours and weekends.